Unit of Measure
1
Double Bend Tubes

Additional Options (* Required Fields)

Number of bent tubes
Tube OD/MWI/Material
Bend 1 Radius
Bend Angle 1
Bend Angle 2
Offset
Leg "A" length of straight after tangent
Leg "B" length of straight after tangent
Leg "C" length of straight after tangent
Distance between bends
Overall length
If not standard square cut, specify end prep required
Paint?
No Yes
If required, Swage size
If Swage I.D. must be held, specify I.D. required
Additional Description or Special Requirements
Boiler Type *
Boiler Model *
Design Pressure *
Design Temperature *
End User Name *
End User Location *
Project Bid Date *
Project Award Date *
Project Onsite Date *
Project Outage Date *
Price *
Budget Firm
Scope of Supply *
Double Bend Drawing