COMPANY HEADER
Unit of Measure
1
Membrane Tube Panels

Additional Options (* Required Fields)

Total number of tubes
Number of panels
Tube OD/MWI/Material
Bar material/size
Panel Length
Tube Spacing
End options
Bar held back from the ends Bar split back from ends
If not standard square cut, specify end prep required
Bar on the outside edge tubes?
Full Half
No Yes
Is bar beveled?
No Yes
Stress Relieve?
No Yes
If hydro, specify pressure
Paint?
No Yes
If required, opening kind/size
If required, opening location
If panel bends, bend radius
If attachments required, specify location
Additional Description or Special Requirements
Boiler Type *
Boiler Model *
Design Pressure *
Design Temperature *
End User Name *
End User Location *
Project Bid Date *
Project Award Date *
Project Onsite Date *
Project Outage Date *
Price *
Budget Firm
Scope of Supply *
Membrane Image